The result will be linked at the according language flag! The cabinet recently approved the tendering of seven desalination and wastewater projects | Hak staff from the Netherlands |
---|---|
Read and watch at your own risk! Country Name :Saudi ArabiaReference No :357690Last Updated :April 17, 2019 Status :Current Project Name : Yanbu - North Jeddah Oil Products Pipeline Project Description :Engineering, Procurement and Construction EPC contract to build a pipeline for | Country Name :Saudi ArabiaReference No :346581Last Updated :April 18, 2019 Status :Current Project Name : Water Injection System Upgrade Project - Manifa Oil Field Description :Carrying out upgrading of the water injection system at an oil field |
.
Since the fuel desulfurization performances is directly related to the IGCC process, this package, as well as the sulfur recovery unit have been transferred from the Jizan Refinery project packages to the Jizan Power Plant project packages | Country Name :Saudi ArabiaReference No :358160Last Updated :April 17, 2019 Status :Current Project Name : Safaniya Oilfield Redevelopment - Phase 6 Description :Engineering, procurement, construction and installation EPCI contract on the s |
---|---|
Country Name :Saudi ArabiaReference No :339793Last Updated :April 23, 2019 Status :New Tender Name : Offshore Pipelines Replacement Project - Berri Oil Field Description :Engineering, Procurement and Construction EPC contract for the replacement of | 58 105 Total 3,150 32 |
ILF has become an international market leader in the field of large-scale water transmission systems.
7A further utilization method to be considered is controlled artificial recharge of the downstream Wadis e | The total reservoir capacity of the dam is 192 million m3 |
---|---|
Desalinated water doesn't fall as torrential precipitation and fill at least 230 dams and increase "subterranean water reserves" |
The total trajectory therefore consists of 900 kilometers of pipeline, 3 pump stations, 13 water reservoirs, 360 kilometers of 13.
15